31st August 2025 – River Maintenance

The work was concentrated on a stretch of the Bramdean Stream upstream of the B3046 bridge. The weeds were very thick and with the change of weather there is a danger of the flow downstream being potentially excessive.

You can be easily lost in the jungle!

The occasional glimpse of the sky.

Helping residents near to the stream maintain fir trees.

Downstream of the bridge, shows how diminished the flow is.

Leave a Reply

Close Menu